Take every cash flow of a project, positive and negative. Discount each one for the time until it arrives. Add them. The total is the net present value. The initial outlay is usually a negative flow at the start, so it is not discounted far, and it pulls the total down.
A positive result means the estimated cash flows clear the discount rate. A negative result means they do not. The sign is not a fact about the future. It is a fact about the estimate. Change the cash flows or the rate and the sign can change.
The sum starts at t = 0 so the cash paid today is included. See discounted cash flow and opportunity cost.