Charts / Supply and production
Stock-to-flow across assets
Compare year-end supply with one full year of new issuance or mine production for Bitcoin, gold, Monero, silver and platinum.
Years of production · linear scale
Crypto measures issued units. The metals use different physical stock measures, shown beside each selected asset.
- BitcoinScheduled subsidy
- 120.4 years
- 19,969,815.625 BTC scheduled stock / 165,881.25 BTC issued on schedule during the year · blocks 877,258–930,340.
- Year-end block ↗Previous year-end block ↗
- GoldCumulative mine output
- 64.66 years
- 213,370 tonnes modelled cumulative mine supply / 3,300 tonnes mined in 2025. estimated rounded world total; source marks the column e (estimated)
- Annual mine output ↗Stock benchmark ↗
Observations and sources (42)
| Date (UTC) | Series | Stock-to-flow | Method and inputs | Source |
|---|---|---|---|---|
| GoldCumulative mine output | 55.62 years | 144,600 tonnes modelled cumulative mine supply / 2,600 tonnes mined in 2001. published historical statistic; workbook does not classify individual yearly values as estimates or reports | Annual mine output ↗Gold!I107, column 'World production', year in A107Stock benchmark ↗Discussion immediately following figure 3, paragraph beginning 'Total world gold production'; cumulative world mine production is illustrated in figure 1. | |
| GoldCumulative mine output | 54.83 years | 142,000 tonnes modelled cumulative mine supply / 2,590 tonnes mined in 2000. published historical statistic; workbook does not classify individual yearly values as estimates or reports | Annual mine output ↗Gold!I106, column 'World production', year in A106Stock benchmark ↗Discussion immediately following figure 3, paragraph beginning 'Total world gold production'; cumulative world mine production is illustrated in figure 1. |
How to read the chart
Each point divides year-end stock by the amount newly issued or mined during that calendar year. A reading of 50 years means that, at that year’s production rate, it would take 50 years to produce the measured stock. A gap marks a year without a complete pair of inputs. Move the year selector over a gap to see which measurements are available.
- Bitcoin. Year-end scheduled subsidy divided by the increase from the preceding year-end block. Scheduled stock includes the genesis subsidy, underclaimed rewards and lost coins.
- Gold. The USGS end-2000 cumulative mine-output estimate plus each following year’s world mine production, divided by production in the reported year. The stock proxy includes historical losses and excludes recycled metal from new supply.