Bird Capital / Research terminal 245 records94 sourced factsCat 44bfb29e

Charts / Supply and production

Stock-to-flow across assets

Compare year-end supply with one full year of new issuance or mine production for Bitcoin, gold, Monero, silver and platinum.

Assets

Years of production · linear scale

Crypto measures issued units. The metals use different physical stock measures, shown beside each selected asset.

Stock-to-flow across assetsYears of production · linear scale. 183 observations from 31 Dec 1900 to 31 Dec 2025. The observation table lists exact values and sources.
UTC ·
BitcoinScheduled subsidy
120.4 years
19,969,815.625 BTC scheduled stock / 165,881.25 BTC issued on schedule during the year · blocks 877,258–930,340.
GoldCumulative mine output
64.66 years
213,370 tonnes modelled cumulative mine supply / 3,300 tonnes mined in 2025. estimated rounded world total; source marks the column e (estimated)
MoneroProtocol issuance
118.7 years
18,693,907.767 XMR protocol issuance / 157,485.971 XMR newly issued in 2025.
SilverCumulative mine output
70.55 years
1,834,400 tonnes cumulative mine output / 26,000 tonnes mined in 2025. USGS estimated mine production.
PlatinumIn-use stock
11.33 years
1,925.482 tonnes in-use stock / 170 tonnes mined in 2025. USGS estimated mine production.
Observations and sources (183)
Date (UTC)SeriesStock-to-flowMethod and inputsSource
SilverCumulative mine output77.03 years502,980 tonnes cumulative mine output / 6,530 tonnes mined in 1922. USGS historical statistic.
SilverCumulative mine output93.14 years496,450 tonnes cumulative mine output / 5,330 tonnes mined in 1921. USGS historical statistic.
SilverCumulative mine output91.12 years491,120 tonnes cumulative mine output / 5,390 tonnes mined in 1920. USGS historical statistic.
SilverCumulative mine output88.48 years485,730 tonnes cumulative mine output / 5,490 tonnes mined in 1919. USGS historical statistic.
SilverCumulative mine output78.21 years480,240 tonnes cumulative mine output / 6,140 tonnes mined in 1918. USGS historical statistic.
SilverCumulative mine output87.47 years474,100 tonnes cumulative mine output / 5,420 tonnes mined in 1917. USGS historical statistic.
SilverCumulative mine output89.27 years468,680 tonnes cumulative mine output / 5,250 tonnes mined in 1916. USGS historical statistic.
SilverCumulative mine output80.88 years463,430 tonnes cumulative mine output / 5,730 tonnes mined in 1915. USGS historical statistic.
SilverCumulative mine output87.35 years457,700 tonnes cumulative mine output / 5,240 tonnes mined in 1914. USGS historical statistic.
SilverCumulative mine output64.54 years452,460 tonnes cumulative mine output / 7,010 tonnes mined in 1913. USGS historical statistic.
SilverCumulative mine output63.82 years445,450 tonnes cumulative mine output / 6,980 tonnes mined in 1912. USGS historical statistic.
SilverCumulative mine output62.28 years438,470 tonnes cumulative mine output / 7,040 tonnes mined in 1911. USGS historical statistic.
SilverCumulative mine output62.53 years431,430 tonnes cumulative mine output / 6,900 tonnes mined in 1910. USGS historical statistic.
SilverCumulative mine output64.32 years424,530 tonnes cumulative mine output / 6,600 tonnes mined in 1909. USGS historical statistic.
SilverCumulative mine output66.13 years417,930 tonnes cumulative mine output / 6,320 tonnes mined in 1908. USGS historical statistic.
SilverCumulative mine output71.83 years411,610 tonnes cumulative mine output / 5,730 tonnes mined in 1907. USGS historical statistic.
SilverCumulative mine output79.12 years405,880 tonnes cumulative mine output / 5,130 tonnes mined in 1906. USGS historical statistic.
SilverCumulative mine output74.77 years400,750 tonnes cumulative mine output / 5,360 tonnes mined in 1905. USGS historical statistic.
SilverCumulative mine output77.38 years395,390 tonnes cumulative mine output / 5,110 tonnes mined in 1904. USGS historical statistic.
SilverCumulative mine output74.77 years390,280 tonnes cumulative mine output / 5,220 tonnes mined in 1903. USGS historical statistic.

How to read the chart

Each point divides year-end stock by the amount newly issued or mined during that calendar year. A reading of 50 years means that, at that year’s production rate, it would take 50 years to produce the measured stock. A gap marks a year without a complete pair of inputs. Move the year selector over a gap to see which measurements are available.

  • Bitcoin. Year-end scheduled subsidy divided by the increase from the preceding year-end block. Scheduled stock includes the genesis subsidy, underclaimed rewards and lost coins.
  • Gold. The USGS end-2000 cumulative mine-output estimate plus each following year’s world mine production, divided by production in the reported year. The stock proxy includes historical losses and excludes recycled metal from new supply.
  • Monero. Year-end issued XMR divided by the change between consecutive year-end block totals. Transaction fees are excluded. Stock is rounded to one micro-XMR, and the launch year supplies the first baseline.
  • Silver. The USGS end-2001 cumulative mine-output benchmark is brought forward or back by the intervening years’ reported world mine production. The ratio divides this stock by that year’s mine production. Stock includes lost or dispersed silver.
  • Platinum. The study models platinum in products in use, including catalysts and jewellery. It excludes bullion inventories. Each published stock measurement is divided by world platinum mine production for that calendar year. Years without stock estimates appear as gaps. In-use stock from Gu et al. (2026), CC BY 4.0. Study methodology ↗

Stock-to-flow dataset and sources ↗