Bird Capital / Research terminal 245 records94 sourced factsCat 44bfb29e

Charts / Supply and production

Stock-to-flow across assets

Compare year-end supply with one full year of new issuance or mine production for Bitcoin, gold, Monero, silver and platinum.

Assets

Years of production · linear scale

Crypto measures issued units. The metals use different physical stock measures, shown beside each selected asset.

Stock-to-flow across assetsYears of production · linear scale. 183 observations from 31 Dec 1900 to 31 Dec 2025. The observation table lists exact values and sources.
UTC ·
BitcoinScheduled subsidy
120.4 years
19,969,815.625 BTC scheduled stock / 165,881.25 BTC issued on schedule during the year · blocks 877,258–930,340.
GoldCumulative mine output
64.66 years
213,370 tonnes modelled cumulative mine supply / 3,300 tonnes mined in 2025. estimated rounded world total; source marks the column e (estimated)
MoneroProtocol issuance
118.7 years
18,693,907.767 XMR protocol issuance / 157,485.971 XMR newly issued in 2025.
SilverCumulative mine output
70.55 years
1,834,400 tonnes cumulative mine output / 26,000 tonnes mined in 2025. USGS estimated mine production.
PlatinumIn-use stock
11.33 years
1,925.482 tonnes in-use stock / 170 tonnes mined in 2025. USGS estimated mine production.
Observations and sources (183)
Date (UTC)SeriesStock-to-flowMethod and inputsSource
SilverCumulative mine output83.87 years652,500 tonnes cumulative mine output / 7,780 tonnes mined in 1942. USGS historical statistic.
SilverCumulative mine output79.2 years644,720 tonnes cumulative mine output / 8,140 tonnes mined in 1941. USGS historical statistic.
SilverCumulative mine output74.28 years636,580 tonnes cumulative mine output / 8,570 tonnes mined in 1940. USGS historical statistic.
SilverCumulative mine output75.66 years628,010 tonnes cumulative mine output / 8,300 tonnes mined in 1939. USGS historical statistic.
SilverCumulative mine output74.48 years619,710 tonnes cumulative mine output / 8,320 tonnes mined in 1938. USGS historical statistic.
SilverCumulative mine output70.76 years611,390 tonnes cumulative mine output / 8,640 tonnes mined in 1937. USGS historical statistic.
SilverCumulative mine output76.1 years602,750 tonnes cumulative mine output / 7,920 tonnes mined in 1936. USGS historical statistic.
SilverCumulative mine output86.33 years594,830 tonnes cumulative mine output / 6,890 tonnes mined in 1935. USGS historical statistic.
SilverCumulative mine output98.15 years587,940 tonnes cumulative mine output / 5,990 tonnes mined in 1934. USGS historical statistic.
SilverCumulative mine output109 years581,950 tonnes cumulative mine output / 5,340 tonnes mined in 1933. USGS historical statistic.
SilverCumulative mine output112.4 years576,610 tonnes cumulative mine output / 5,130 tonnes mined in 1932. USGS historical statistic.
SilverCumulative mine output93.99 years571,480 tonnes cumulative mine output / 6,080 tonnes mined in 1931. USGS historical statistic.
SilverCumulative mine output73.05 years565,400 tonnes cumulative mine output / 7,740 tonnes mined in 1930. USGS historical statistic.
SilverCumulative mine output68.68 years557,660 tonnes cumulative mine output / 8,120 tonnes mined in 1929. USGS historical statistic.
SilverCumulative mine output68.52 years549,540 tonnes cumulative mine output / 8,020 tonnes mined in 1928. USGS historical statistic.
SilverCumulative mine output68.55 years541,520 tonnes cumulative mine output / 7,900 tonnes mined in 1927. USGS historical statistic.
SilverCumulative mine output67.63 years533,620 tonnes cumulative mine output / 7,890 tonnes mined in 1926. USGS historical statistic.
SilverCumulative mine output68.72 years525,730 tonnes cumulative mine output / 7,650 tonnes mined in 1925. USGS historical statistic.
SilverCumulative mine output69.54 years518,080 tonnes cumulative mine output / 7,450 tonnes mined in 1924. USGS historical statistic.
SilverCumulative mine output66.75 years510,630 tonnes cumulative mine output / 7,650 tonnes mined in 1923. USGS historical statistic.

How to read the chart

Each point divides year-end stock by the amount newly issued or mined during that calendar year. A reading of 50 years means that, at that year’s production rate, it would take 50 years to produce the measured stock. A gap marks a year without a complete pair of inputs. Move the year selector over a gap to see which measurements are available.

  • Bitcoin. Year-end scheduled subsidy divided by the increase from the preceding year-end block. Scheduled stock includes the genesis subsidy, underclaimed rewards and lost coins.
  • Gold. The USGS end-2000 cumulative mine-output estimate plus each following year’s world mine production, divided by production in the reported year. The stock proxy includes historical losses and excludes recycled metal from new supply.
  • Monero. Year-end issued XMR divided by the change between consecutive year-end block totals. Transaction fees are excluded. Stock is rounded to one micro-XMR, and the launch year supplies the first baseline.
  • Silver. The USGS end-2001 cumulative mine-output benchmark is brought forward or back by the intervening years’ reported world mine production. The ratio divides this stock by that year’s mine production. Stock includes lost or dispersed silver.
  • Platinum. The study models platinum in products in use, including catalysts and jewellery. It excludes bullion inventories. Each published stock measurement is divided by world platinum mine production for that calendar year. Years without stock estimates appear as gaps. In-use stock from Gu et al. (2026), CC BY 4.0. Study methodology ↗

Stock-to-flow dataset and sources ↗