Bird Capital / Research terminal 245 records94 sourced factsCat 44bfb29e

Charts / Supply and production

Stock-to-flow across assets

Compare year-end supply with one full year of new issuance or mine production for Bitcoin, gold, Monero, silver and platinum.

Assets

Years of production · linear scale

Crypto measures issued units. The metals use different physical stock measures, shown beside each selected asset.

Stock-to-flow across assetsYears of production · linear scale. 183 observations from 31 Dec 1900 to 31 Dec 2025. The observation table lists exact values and sources.
UTC ·
BitcoinScheduled subsidy
120.4 years
19,969,815.625 BTC scheduled stock / 165,881.25 BTC issued on schedule during the year · blocks 877,258–930,340.
GoldCumulative mine output
64.66 years
213,370 tonnes modelled cumulative mine supply / 3,300 tonnes mined in 2025. estimated rounded world total; source marks the column e (estimated)
MoneroProtocol issuance
118.7 years
18,693,907.767 XMR protocol issuance / 157,485.971 XMR newly issued in 2025.
SilverCumulative mine output
70.55 years
1,834,400 tonnes cumulative mine output / 26,000 tonnes mined in 2025. USGS estimated mine production.
PlatinumIn-use stock
11.33 years
1,925.482 tonnes in-use stock / 170 tonnes mined in 2025. USGS estimated mine production.
Observations and sources (183)
Date (UTC)SeriesStock-to-flowMethod and inputsSource
SilverCumulative mine output102 years780,550 tonnes cumulative mine output / 7,650 tonnes mined in 1962. USGS historical statistic.
SilverCumulative mine output104.9 years772,900 tonnes cumulative mine output / 7,370 tonnes mined in 1961. USGS historical statistic.
SilverCumulative mine output104.6 years765,530 tonnes cumulative mine output / 7,320 tonnes mined in 1960. USGS historical statistic.
SilverCumulative mine output109.7 years758,210 tonnes cumulative mine output / 6,910 tonnes mined in 1959. USGS historical statistic.
SilverCumulative mine output101.1 years751,300 tonnes cumulative mine output / 7,430 tonnes mined in 1958. USGS historical statistic.
SilverCumulative mine output103.5 years743,870 tonnes cumulative mine output / 7,190 tonnes mined in 1957. USGS historical statistic.
SilverCumulative mine output104.9 years736,680 tonnes cumulative mine output / 7,020 tonnes mined in 1956. USGS historical statistic.
SilverCumulative mine output104.2 years729,660 tonnes cumulative mine output / 7,000 tonnes mined in 1955. USGS historical statistic.
SilverCumulative mine output108.3 years722,660 tonnes cumulative mine output / 6,670 tonnes mined in 1954. USGS historical statistic.
SilverCumulative mine output103.8 years715,990 tonnes cumulative mine output / 6,900 tonnes mined in 1953. USGS historical statistic.
SilverCumulative mine output105.8 years709,090 tonnes cumulative mine output / 6,700 tonnes mined in 1952. USGS historical statistic.
SilverCumulative mine output113.1 years702,390 tonnes cumulative mine output / 6,210 tonnes mined in 1951. USGS historical statistic.
SilverCumulative mine output110.2 years696,180 tonnes cumulative mine output / 6,320 tonnes mined in 1950. USGS historical statistic.
SilverCumulative mine output123.9 years689,860 tonnes cumulative mine output / 5,570 tonnes mined in 1949. USGS historical statistic.
SilverCumulative mine output125.8 years684,290 tonnes cumulative mine output / 5,440 tonnes mined in 1948. USGS historical statistic.
SilverCumulative mine output130 years678,850 tonnes cumulative mine output / 5,220 tonnes mined in 1947. USGS historical statistic.
SilverCumulative mine output169.7 years673,630 tonnes cumulative mine output / 3,970 tonnes mined in 1946. USGS historical statistic.
SilverCumulative mine output132.9 years669,660 tonnes cumulative mine output / 5,040 tonnes mined in 1945. USGS historical statistic.
SilverCumulative mine output115.8 years664,620 tonnes cumulative mine output / 5,740 tonnes mined in 1944. USGS historical statistic.
SilverCumulative mine output103.3 years658,880 tonnes cumulative mine output / 6,380 tonnes mined in 1943. USGS historical statistic.

How to read the chart

Each point divides year-end stock by the amount newly issued or mined during that calendar year. A reading of 50 years means that, at that year’s production rate, it would take 50 years to produce the measured stock. A gap marks a year without a complete pair of inputs. Move the year selector over a gap to see which measurements are available.

  • Bitcoin. Year-end scheduled subsidy divided by the increase from the preceding year-end block. Scheduled stock includes the genesis subsidy, underclaimed rewards and lost coins.
  • Gold. The USGS end-2000 cumulative mine-output estimate plus each following year’s world mine production, divided by production in the reported year. The stock proxy includes historical losses and excludes recycled metal from new supply.
  • Monero. Year-end issued XMR divided by the change between consecutive year-end block totals. Transaction fees are excluded. Stock is rounded to one micro-XMR, and the launch year supplies the first baseline.
  • Silver. The USGS end-2001 cumulative mine-output benchmark is brought forward or back by the intervening years’ reported world mine production. The ratio divides this stock by that year’s mine production. Stock includes lost or dispersed silver.
  • Platinum. The study models platinum in products in use, including catalysts and jewellery. It excludes bullion inventories. Each published stock measurement is divided by world platinum mine production for that calendar year. Years without stock estimates appear as gaps. In-use stock from Gu et al. (2026), CC BY 4.0. Study methodology ↗

Stock-to-flow dataset and sources ↗