Bird Capital / Research terminal 245 records94 sourced factsCat 44bfb29e

Charts / Supply and production

Stock-to-flow across assets

Compare year-end supply with one full year of new issuance or mine production for Bitcoin, gold, Monero, silver and platinum.

Assets

Years of production · linear scale

Crypto measures issued units. The metals use different physical stock measures, shown beside each selected asset.

Stock-to-flow across assetsYears of production · linear scale. 183 observations from 31 Dec 1900 to 31 Dec 2025. The observation table lists exact values and sources.
UTC ·
BitcoinScheduled subsidy
120.4 years
19,969,815.625 BTC scheduled stock / 165,881.25 BTC issued on schedule during the year · blocks 877,258–930,340.
GoldCumulative mine output
64.66 years
213,370 tonnes modelled cumulative mine supply / 3,300 tonnes mined in 2025. estimated rounded world total; source marks the column e (estimated)
MoneroProtocol issuance
118.7 years
18,693,907.767 XMR protocol issuance / 157,485.971 XMR newly issued in 2025.
SilverCumulative mine output
70.55 years
1,834,400 tonnes cumulative mine output / 26,000 tonnes mined in 2025. USGS estimated mine production.
PlatinumIn-use stock
11.33 years
1,925.482 tonnes in-use stock / 170 tonnes mined in 2025. USGS estimated mine production.
Observations and sources (183)
Date (UTC)SeriesStock-to-flowMethod and inputsSource
SilverCumulative mine output84.3 years969,500 tonnes cumulative mine output / 11,500 tonnes mined in 1982. USGS historical statistic.
SilverCumulative mine output85.54 years958,000 tonnes cumulative mine output / 11,200 tonnes mined in 1981. USGS historical statistic.
SilverCumulative mine output88.49 years946,800 tonnes cumulative mine output / 10,700 tonnes mined in 1980. USGS historical statistic.
SilverCumulative mine output86.68 years936,100 tonnes cumulative mine output / 10,800 tonnes mined in 1979. USGS historical statistic.
SilverCumulative mine output86.48 years925,300 tonnes cumulative mine output / 10,700 tonnes mined in 1978. USGS historical statistic.
SilverCumulative mine output88.8 years914,600 tonnes cumulative mine output / 10,300 tonnes mined in 1977. USGS historical statistic.
SilverCumulative mine output91.9 years904,300 tonnes cumulative mine output / 9,840 tonnes mined in 1976. USGS historical statistic.
SilverCumulative mine output94.85 years894,460 tonnes cumulative mine output / 9,430 tonnes mined in 1975. USGS historical statistic.
SilverCumulative mine output95.58 years885,030 tonnes cumulative mine output / 9,260 tonnes mined in 1974. USGS historical statistic.
SilverCumulative mine output90.29 years875,770 tonnes cumulative mine output / 9,700 tonnes mined in 1973. USGS historical statistic.
SilverCumulative mine output92.33 years866,070 tonnes cumulative mine output / 9,380 tonnes mined in 1972. USGS historical statistic.
SilverCumulative mine output93.42 years856,690 tonnes cumulative mine output / 9,170 tonnes mined in 1971. USGS historical statistic.
SilverCumulative mine output90.55 years847,520 tonnes cumulative mine output / 9,360 tonnes mined in 1970. USGS historical statistic.
SilverCumulative mine output91.1 years838,160 tonnes cumulative mine output / 9,200 tonnes mined in 1969. USGS historical statistic.
SilverCumulative mine output96.84 years828,960 tonnes cumulative mine output / 8,560 tonnes mined in 1968. USGS historical statistic.
SilverCumulative mine output102.2 years820,400 tonnes cumulative mine output / 8,030 tonnes mined in 1967. USGS historical statistic.
SilverCumulative mine output97.88 years812,370 tonnes cumulative mine output / 8,300 tonnes mined in 1966. USGS historical statistic.
SilverCumulative mine output100.4 years804,070 tonnes cumulative mine output / 8,010 tonnes mined in 1965. USGS historical statistic.
SilverCumulative mine output103 years796,060 tonnes cumulative mine output / 7,730 tonnes mined in 1964. USGS historical statistic.
SilverCumulative mine output101.3 years788,330 tonnes cumulative mine output / 7,780 tonnes mined in 1963. USGS historical statistic.

How to read the chart

Each point divides year-end stock by the amount newly issued or mined during that calendar year. A reading of 50 years means that, at that year’s production rate, it would take 50 years to produce the measured stock. A gap marks a year without a complete pair of inputs. Move the year selector over a gap to see which measurements are available.

  • Bitcoin. Year-end scheduled subsidy divided by the increase from the preceding year-end block. Scheduled stock includes the genesis subsidy, underclaimed rewards and lost coins.
  • Gold. The USGS end-2000 cumulative mine-output estimate plus each following year’s world mine production, divided by production in the reported year. The stock proxy includes historical losses and excludes recycled metal from new supply.
  • Monero. Year-end issued XMR divided by the change between consecutive year-end block totals. Transaction fees are excluded. Stock is rounded to one micro-XMR, and the launch year supplies the first baseline.
  • Silver. The USGS end-2001 cumulative mine-output benchmark is brought forward or back by the intervening years’ reported world mine production. The ratio divides this stock by that year’s mine production. Stock includes lost or dispersed silver.
  • Platinum. The study models platinum in products in use, including catalysts and jewellery. It excludes bullion inventories. Each published stock measurement is divided by world platinum mine production for that calendar year. Years without stock estimates appear as gaps. In-use stock from Gu et al. (2026), CC BY 4.0. Study methodology ↗

Stock-to-flow dataset and sources ↗