Bird Capital / Research terminal 245 records94 sourced factsCat 44bfb29e

Charts / Supply and production

Stock-to-flow across assets

Compare year-end supply with one full year of new issuance or mine production for Bitcoin, gold, Monero, silver and platinum.

Assets

Years of production · linear scale

Crypto measures issued units. The metals use different physical stock measures, shown beside each selected asset.

Stock-to-flow across assetsYears of production · linear scale. 183 observations from 31 Dec 1900 to 31 Dec 2025. The observation table lists exact values and sources.
UTC ·
BitcoinScheduled subsidy
120.4 years
19,969,815.625 BTC scheduled stock / 165,881.25 BTC issued on schedule during the year · blocks 877,258–930,340.
GoldCumulative mine output
64.66 years
213,370 tonnes modelled cumulative mine supply / 3,300 tonnes mined in 2025. estimated rounded world total; source marks the column e (estimated)
MoneroProtocol issuance
118.7 years
18,693,907.767 XMR protocol issuance / 157,485.971 XMR newly issued in 2025.
SilverCumulative mine output
70.55 years
1,834,400 tonnes cumulative mine output / 26,000 tonnes mined in 2025. USGS estimated mine production.
PlatinumIn-use stock
11.33 years
1,925.482 tonnes in-use stock / 170 tonnes mined in 2025. USGS estimated mine production.
Observations and sources (183)
Date (UTC)SeriesStock-to-flowMethod and inputsSource
MoneroProtocol issuance4.395 years13,661,841.974 XMR protocol issuance / 3,108,228.421 XMR newly issued in 2016.
SilverCumulative mine output56.11 years1,604,700 tonnes cumulative mine output / 28,600 tonnes mined in 2016. USGS historical statistic.
BitcoinScheduled subsidy11.07 years15,029,550 BTC scheduled stock / 1,358,025 BTC issued on schedule during the year · blocks 336,860–391,181.
GoldCumulative mine output58.45 years181,200 tonnes modelled cumulative mine supply / 3,100 tonnes mined in 2015. published historical statistic; workbook does not classify individual yearly values as estimates or reports
MoneroProtocol issuance2.081 years10,553,613.553 XMR protocol issuance / 5,071,503.226 XMR newly issued in 2015.
PlatinumIn-use stock8.992 years1,699.562 tonnes in-use stock / 189 tonnes mined in 2015. USGS rounded mine production.
SilverCumulative mine output57.11 years1,576,100 tonnes cumulative mine output / 27,600 tonnes mined in 2015. USGS historical statistic.
BitcoinScheduled subsidy9.29 years13,671,525 BTC scheduled stock / 1,471,625 BTC issued on schedule during the year · blocks 277,995–336,860.
GoldCumulative mine output58.59 years178,100 tonnes modelled cumulative mine supply / 3,040 tonnes mined in 2014. published historical statistic; workbook does not classify individual yearly values as estimates or reports
SilverCumulative mine output55.3 years1,548,500 tonnes cumulative mine output / 28,000 tonnes mined in 2014. USGS historical statistic.
BitcoinScheduled subsidy7.693 years12,199,900 BTC scheduled stock / 1,585,825 BTC issued on schedule during the year · blocks 214,562–277,995.
GoldCumulative mine output59.14 years175,060 tonnes modelled cumulative mine supply / 2,960 tonnes mined in 2013. published historical statistic; workbook does not classify individual yearly values as estimates or reports
SilverCumulative mine output56.95 years1,520,500 tonnes cumulative mine output / 26,700 tonnes mined in 2013. USGS historical statistic.
BitcoinScheduled subsidy4.063 years10,614,075 BTC scheduled stock / 2,612,225 BTC issued on schedule during the year · blocks 160,036–214,562.
GoldCumulative mine output62.81 years172,100 tonnes modelled cumulative mine supply / 2,740 tonnes mined in 2012. published historical statistic; workbook does not classify individual yearly values as estimates or reports
SilverCumulative mine output61.47 years1,493,800 tonnes cumulative mine output / 24,300 tonnes mined in 2012. USGS historical statistic.
BitcoinScheduled subsidy2.684 years8,001,850 BTC scheduled stock / 2,981,350 BTC issued on schedule during the year · blocks 100,409–160,036.
GoldCumulative mine output63.19 years169,360 tonnes modelled cumulative mine supply / 2,680 tonnes mined in 2011. published historical statistic; workbook does not classify individual yearly values as estimates or reports
PlatinumIn-use stock7.443 years1,451.383 tonnes in-use stock / 195 tonnes mined in 2011. USGS rounded mine production.
SilverCumulative mine output63.07 years1,469,500 tonnes cumulative mine output / 23,300 tonnes mined in 2011. USGS historical statistic.

How to read the chart

Each point divides year-end stock by the amount newly issued or mined during that calendar year. A reading of 50 years means that, at that year’s production rate, it would take 50 years to produce the measured stock. A gap marks a year without a complete pair of inputs. Move the year selector over a gap to see which measurements are available.

  • Bitcoin. Year-end scheduled subsidy divided by the increase from the preceding year-end block. Scheduled stock includes the genesis subsidy, underclaimed rewards and lost coins.
  • Gold. The USGS end-2000 cumulative mine-output estimate plus each following year’s world mine production, divided by production in the reported year. The stock proxy includes historical losses and excludes recycled metal from new supply.
  • Monero. Year-end issued XMR divided by the change between consecutive year-end block totals. Transaction fees are excluded. Stock is rounded to one micro-XMR, and the launch year supplies the first baseline.
  • Silver. The USGS end-2001 cumulative mine-output benchmark is brought forward or back by the intervening years’ reported world mine production. The ratio divides this stock by that year’s mine production. Stock includes lost or dispersed silver.
  • Platinum. The study models platinum in products in use, including catalysts and jewellery. It excludes bullion inventories. Each published stock measurement is divided by world platinum mine production for that calendar year. Years without stock estimates appear as gaps. In-use stock from Gu et al. (2026), CC BY 4.0. Study methodology ↗

Stock-to-flow dataset and sources ↗