Bird Capital / Research terminal 245 records94 sourced factsCat 44bfb29e

Charts / Supply and production

Stock-to-flow across assets

Compare year-end supply with one full year of new issuance or mine production for Bitcoin, gold, Monero, silver and platinum.

Assets

Years of production · linear scale

Crypto measures issued units. The metals use different physical stock measures, shown beside each selected asset.

Stock-to-flow across assetsYears of production · linear scale. 183 observations from 31 Dec 1900 to 31 Dec 2025. The observation table lists exact values and sources.
UTC ·
BitcoinScheduled subsidy
120.4 years
19,969,815.625 BTC scheduled stock / 165,881.25 BTC issued on schedule during the year · blocks 877,258–930,340.
GoldCumulative mine output
64.66 years
213,370 tonnes modelled cumulative mine supply / 3,300 tonnes mined in 2025. estimated rounded world total; source marks the column e (estimated)
MoneroProtocol issuance
118.7 years
18,693,907.767 XMR protocol issuance / 157,485.971 XMR newly issued in 2025.
SilverCumulative mine output
70.55 years
1,834,400 tonnes cumulative mine output / 26,000 tonnes mined in 2025. USGS estimated mine production.
PlatinumIn-use stock
11.33 years
1,925.482 tonnes in-use stock / 170 tonnes mined in 2025. USGS estimated mine production.
Observations and sources (183)
Date (UTC)SeriesStock-to-flowMethod and inputsSource
SilverCumulative mine output69.28 years1,732,000 tonnes cumulative mine output / 25,000 tonnes mined in 2021. USGS historical statistic.
BitcoinScheduled subsidy41 years18,586,956.25 BTC scheduled stock / 453,318.75 BTC issued on schedule during the year · blocks 610,690–663,912.
GoldCumulative mine output64.68 years197,260 tonnes modelled cumulative mine supply / 3,050 tonnes mined in 2020. published historical statistic; workbook does not classify individual yearly values as estimates or reports
MoneroProtocol issuance42.27 years17,801,034.001 XMR protocol issuance / 421,172.87 XMR newly issued in 2020.
PlatinumIn-use stock11.14 years1,848.574 tonnes in-use stock / 166 tonnes mined in 2020. USGS rounded mine production.
SilverCumulative mine output70.83 years1,707,000 tonnes cumulative mine output / 24,100 tonnes mined in 2020. USGS historical statistic.
BitcoinScheduled subsidy26.75 years18,133,637.5 BTC scheduled stock / 677,900 BTC issued on schedule during the year · blocks 556,458–610,690.
GoldCumulative mine output59.57 years194,210 tonnes modelled cumulative mine supply / 3,260 tonnes mined in 2019. published historical statistic; workbook does not classify individual yearly values as estimates or reports
MoneroProtocol issuance25.08 years17,379,861.131 XMR protocol issuance / 692,942.486 XMR newly issued in 2019.
SilverCumulative mine output65.23 years1,682,900 tonnes cumulative mine output / 25,800 tonnes mined in 2019. USGS historical statistic.
BitcoinScheduled subsidy25.62 years17,455,737.5 BTC scheduled stock / 681,225 BTC issued on schedule during the year · blocks 501,960–556,458.
GoldCumulative mine output57.69 years190,950 tonnes modelled cumulative mine supply / 3,310 tonnes mined in 2018. published historical statistic; workbook does not classify individual yearly values as estimates or reports
MoneroProtocol issuance14.65 years16,686,918.645 XMR protocol issuance / 1,139,115.027 XMR newly issued in 2018.
SilverCumulative mine output63.98 years1,657,100 tonnes cumulative mine output / 25,900 tonnes mined in 2018. USGS historical statistic.
BitcoinScheduled subsidy23.99 years16,774,512.5 BTC scheduled stock / 699,100 BTC issued on schedule during the year · blocks 446,032–501,960.
GoldCumulative mine output57.56 years187,640 tonnes modelled cumulative mine supply / 3,260 tonnes mined in 2017. published historical statistic; workbook does not classify individual yearly values as estimates or reports
MoneroProtocol issuance8.244 years15,547,803.618 XMR protocol issuance / 1,885,961.644 XMR newly issued in 2017.
SilverCumulative mine output61.55 years1,631,200 tonnes cumulative mine output / 26,500 tonnes mined in 2017. USGS historical statistic.
BitcoinScheduled subsidy15.37 years16,075,412.5 BTC scheduled stock / 1,045,862.5 BTC issued on schedule during the year · blocks 391,181–446,032.
GoldCumulative mine output57.98 years184,380 tonnes modelled cumulative mine supply / 3,180 tonnes mined in 2016. published historical statistic; workbook does not classify individual yearly values as estimates or reports

How to read the chart

Each point divides year-end stock by the amount newly issued or mined during that calendar year. A reading of 50 years means that, at that year’s production rate, it would take 50 years to produce the measured stock. A gap marks a year without a complete pair of inputs. Move the year selector over a gap to see which measurements are available.

  • Bitcoin. Year-end scheduled subsidy divided by the increase from the preceding year-end block. Scheduled stock includes the genesis subsidy, underclaimed rewards and lost coins.
  • Gold. The USGS end-2000 cumulative mine-output estimate plus each following year’s world mine production, divided by production in the reported year. The stock proxy includes historical losses and excludes recycled metal from new supply.
  • Monero. Year-end issued XMR divided by the change between consecutive year-end block totals. Transaction fees are excluded. Stock is rounded to one micro-XMR, and the launch year supplies the first baseline.
  • Silver. The USGS end-2001 cumulative mine-output benchmark is brought forward or back by the intervening years’ reported world mine production. The ratio divides this stock by that year’s mine production. Stock includes lost or dispersed silver.
  • Platinum. The study models platinum in products in use, including catalysts and jewellery. It excludes bullion inventories. Each published stock measurement is divided by world platinum mine production for that calendar year. Years without stock estimates appear as gaps. In-use stock from Gu et al. (2026), CC BY 4.0. Study methodology ↗

Stock-to-flow dataset and sources ↗