Charts / Supply and production
Stock-to-flow across assets
Compare year-end supply with one full year of new issuance or mine production for Bitcoin, gold, Monero, silver and platinum.
Years of production · linear scale
Crypto measures issued units. The metals use different physical stock measures, shown beside each selected asset.
- BitcoinScheduled subsidy
- 120.4 years
- 19,969,815.625 BTC scheduled stock / 165,881.25 BTC issued on schedule during the year · blocks 877,258–930,340.
- Year-end block ↗Previous year-end block ↗
- GoldCumulative mine output
- 64.66 years
- 213,370 tonnes modelled cumulative mine supply / 3,300 tonnes mined in 2025. estimated rounded world total; source marks the column e (estimated)
- Annual mine output ↗Stock benchmark ↗
Observations and sources (42)
| Date (UTC) | Series | Stock-to-flow | Method and inputs | Source |
|---|---|---|---|---|
| BitcoinScheduled subsidy | 120.4 years | 19,969,815.625 BTC scheduled stock / 165,881.25 BTC issued on schedule during the year · blocks 877,258–930,340. | Year-end block ↗Previous year-end block ↗ | |
| GoldCumulative mine output | 64.66 years | 213,370 tonnes modelled cumulative mine supply / 3,300 tonnes mined in 2025. estimated rounded world total; source marks the column e (estimated) | Annual mine output ↗Gold, second chapter page: 'World Mine Production and Reserves', World total (rounded), Mine production 2025.Stock benchmark ↗Discussion immediately following figure 3, paragraph beginning 'Total world gold production'; cumulative world mine production is illustrated in figure 1. | |
| BitcoinScheduled subsidy | 90.94 years | 19,803,934.375 BTC scheduled stock / 217,771.875 BTC issued on schedule during the year · blocks 823,785–877,258. | Year-end block ↗Previous year-end block ↗ | |
| GoldCumulative mine output | 64.05 years | 210,070 tonnes modelled cumulative mine supply / 3,280 tonnes mined in 2024. published rounded world total; previous-year column | Annual mine output ↗Gold, second chapter page: 'World Mine Production and Reserves', World total (rounded), Mine production 2024.Stock benchmark ↗Discussion immediately following figure 3, paragraph beginning 'Total world gold production'; cumulative world mine production is illustrated in figure 1. | |
| BitcoinScheduled subsidy | 58.03 years | 19,586,162.5 BTC scheduled stock / 337,493.75 BTC issued on schedule during the year · blocks 769,786–823,785. | Year-end block ↗Previous year-end block ↗ | |
| GoldCumulative mine output | 63.63 years | 206,790 tonnes modelled cumulative mine supply / 3,250 tonnes mined in 2023. published rounded world total; previous-year column | Annual mine output ↗Gold, second chapter page: 'World Mine Production and Reserves', World total (rounded), Mine production 2023.Stock benchmark ↗Discussion immediately following figure 3, paragraph beginning 'Total world gold production'; cumulative world mine production is illustrated in figure 1. | |
| BitcoinScheduled subsidy | 57.9 years | 19,248,668.75 BTC scheduled stock / 332,425 BTC issued on schedule during the year · blocks 716,598–769,786. | Year-end block ↗Previous year-end block ↗ | |
| GoldCumulative mine output | 64.41 years | 203,540 tonnes modelled cumulative mine supply / 3,160 tonnes mined in 2022. published historical statistic; workbook does not classify individual yearly values as estimates or reports | Annual mine output ↗Gold!I128, column 'World production', year in A128Stock benchmark ↗Discussion immediately following figure 3, paragraph beginning 'Total world gold production'; cumulative world mine production is illustrated in figure 1. | |
| BitcoinScheduled subsidy | 57.45 years | 18,916,243.75 BTC scheduled stock / 329,287.5 BTC issued on schedule during the year · blocks 663,912–716,598. | Year-end block ↗Previous year-end block ↗ | |
| GoldCumulative mine output | 64.22 years | 200,380 tonnes modelled cumulative mine supply / 3,120 tonnes mined in 2021. published historical statistic; workbook does not classify individual yearly values as estimates or reports | Annual mine output ↗Gold!I127, column 'World production', year in A127Stock benchmark ↗Discussion immediately following figure 3, paragraph beginning 'Total world gold production'; cumulative world mine production is illustrated in figure 1. | |
| BitcoinScheduled subsidy | 41 years | 18,586,956.25 BTC scheduled stock / 453,318.75 BTC issued on schedule during the year · blocks 610,690–663,912. | Year-end block ↗Previous year-end block ↗ | |
| GoldCumulative mine output | 64.68 years | 197,260 tonnes modelled cumulative mine supply / 3,050 tonnes mined in 2020. published historical statistic; workbook does not classify individual yearly values as estimates or reports | Annual mine output ↗Gold!I126, column 'World production', year in A126Stock benchmark ↗Discussion immediately following figure 3, paragraph beginning 'Total world gold production'; cumulative world mine production is illustrated in figure 1. | |
| BitcoinScheduled subsidy | 26.75 years | 18,133,637.5 BTC scheduled stock / 677,900 BTC issued on schedule during the year · blocks 556,458–610,690. | Year-end block ↗Previous year-end block ↗ | |
| GoldCumulative mine output | 59.57 years | 194,210 tonnes modelled cumulative mine supply / 3,260 tonnes mined in 2019. published historical statistic; workbook does not classify individual yearly values as estimates or reports | Annual mine output ↗Gold!I125, column 'World production', year in A125Stock benchmark ↗Discussion immediately following figure 3, paragraph beginning 'Total world gold production'; cumulative world mine production is illustrated in figure 1. | |
| BitcoinScheduled subsidy | 25.62 years | 17,455,737.5 BTC scheduled stock / 681,225 BTC issued on schedule during the year · blocks 501,960–556,458. | Year-end block ↗Previous year-end block ↗ | |
| GoldCumulative mine output | 57.69 years | 190,950 tonnes modelled cumulative mine supply / 3,310 tonnes mined in 2018. published historical statistic; workbook does not classify individual yearly values as estimates or reports | Annual mine output ↗Gold!I124, column 'World production', year in A124Stock benchmark ↗Discussion immediately following figure 3, paragraph beginning 'Total world gold production'; cumulative world mine production is illustrated in figure 1. | |
| BitcoinScheduled subsidy | 23.99 years | 16,774,512.5 BTC scheduled stock / 699,100 BTC issued on schedule during the year · blocks 446,032–501,960. | Year-end block ↗Previous year-end block ↗ | |
| GoldCumulative mine output | 57.56 years | 187,640 tonnes modelled cumulative mine supply / 3,260 tonnes mined in 2017. published historical statistic; workbook does not classify individual yearly values as estimates or reports | Annual mine output ↗Gold!I123, column 'World production', year in A123Stock benchmark ↗Discussion immediately following figure 3, paragraph beginning 'Total world gold production'; cumulative world mine production is illustrated in figure 1. | |
| BitcoinScheduled subsidy | 15.37 years | 16,075,412.5 BTC scheduled stock / 1,045,862.5 BTC issued on schedule during the year · blocks 391,181–446,032. | Year-end block ↗Previous year-end block ↗ | |
| GoldCumulative mine output | 57.98 years | 184,380 tonnes modelled cumulative mine supply / 3,180 tonnes mined in 2016. published historical statistic; workbook does not classify individual yearly values as estimates or reports | Annual mine output ↗Gold!I122, column 'World production', year in A122Stock benchmark ↗Discussion immediately following figure 3, paragraph beginning 'Total world gold production'; cumulative world mine production is illustrated in figure 1. |
How to read the chart
Each point divides year-end stock by the amount newly issued or mined during that calendar year. A reading of 50 years means that, at that year’s production rate, it would take 50 years to produce the measured stock. A gap marks a year without a complete pair of inputs. Move the year selector over a gap to see which measurements are available.
- Bitcoin. Year-end scheduled subsidy divided by the increase from the preceding year-end block. Scheduled stock includes the genesis subsidy, underclaimed rewards and lost coins.
- Gold. The USGS end-2000 cumulative mine-output estimate plus each following year’s world mine production, divided by production in the reported year. The stock proxy includes historical losses and excludes recycled metal from new supply.